Condition of the visible hydraulic cylinders of the crane
Cylinders are oil-dry
visible cracks at the crane
No crack or noticeable damage detectable
Condition of the frame-suspension of the crane
Frame suspension is stable and does not move when crane in heavy use
Condition of hydraulic hose of crane
Sealed and functional - but initially porous
Condition of slewing system
No radial backlash visible
Functionality of the crane
Crane works partially. Problems evident
Anzahl der Kran Betriebsstunden
2500
Operating hours of the crane readable
Yes
Technical equipment of the crane
- Radio control
- Manual control unit